Electric Vehicle Charging Stations Project

About the Project

The following facilities will be adding level 2 electric vehicle charging stations to its amenities to better serve residents and visitors looking to commute in electric style.

A level 2 charging station uses a 240-volt plug to quickly charge an electric vehicle (EV). These charging stations can fully charge an EV in five to ten hours (or 30-90 km/hour). This style of charger utilizes a standard connector (SAE J1772 plug). Level 2 charging stations plug into the same 240V outlet that a clothes dryer or oven would use and deliver more power than a Level 1 charger, charging an EV battery much quicker.

Charging Station Location# of ChargersInstallation Timeline
Servus Credit Union Place8June to July 2023 - Complete
Nakî Transit Centre & Park and Ride4June to July 2023 - Complete
St. Albert Place6June to July 2023 - Complete
Fountain Park Recreation Centre6Summer 2023 - Complete

Other Charging Station Locations

There are currently two other City-run charging stations at Fire Hall #1 (20 Gate Ave) and St. Albert Business Centre (29 Sir Winston Churchill Ave). 

Please Note: The Fire Hall #1 EV chargers and the future EV chargers will be pay-for-use and will charge $1.50/hr of charging. The EV charger behind St. Albert Business Centre is currently free to charge.

As the City works to install the charging stations above, interested residents can use these locations as well as Plugshare and ChargeHub to find current charging locations in St. Albert.

  
Interactive Map

Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year! 

Launch the Map

 