Back Lane Reconstruction
About the Project
The City will be reconstructing back lanes within the Braeside neighbourhood. This work is being done to extend their service life and reduce the overall maintenance requirements.
BRAESIDE
The following lanes WERE reconstructed and completed in 2024:
- 41-59 Balmoral Dr., 42-60 Belmont Dr.
- 4-14 Birch Dr., 3-13 Belmont Dr.
- 28-46 Birch Dr., 29-47 Belmont Dr.
- 12-30 Sturgeon Rd., 15-31 Birch Dr.
- 32-50 Sturgeon Rd., 33-51 Birch Dr.
Interactive Map
Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year!
Launch the MapRelated Pages
Last edited: October 28, 2024