Bridge Program
About the Project
The City of St. Albert and its residents rely on a well-maintained transportation network for economic activity, access to services and residential commutes, which includes a network of bridge structures. To maintain our bridge network, the City of St. Albert oversees assessments of each structure every 1-3 years. The City uses these assessments to prioritize bridge structures for rehabilitation or replacement at the appropriate time to maximize budget and minimize disruption to users.
The City is rehabilitating bridges in 2024 and 2025. Rehabilitation work is done to extend the service life and reduce the overall maintenance requirements; Reconstruction is done as the bridge has reached, or is nearing the end of, its serviceable life.
The following bridges are undergoing rehabilitation in 2024/2025:
- Perron Street Bridge.
- St. Albert Trail Bridge.
Closure currently in place, anticipated until mid-October:
Note: Trail closures will occur underneath each bridge during construction due to required trail rehabilitation. Please follow detour signage in place to avoid active work zones.
View the Red Willow Trail Closure Detour Map

Note: a portion of the parking area at 1 Sturgeon Road will be used as a contractor laydown area. Parking will be limited during construction.

Project Timeline
- Perron Street Bridge North - Complete
- Perron Street Bridge South - 2025
- St. Albert Trail Bridge North - Complete
- St. Albert Trail Bridge South - 2025
Interactive Map
Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year!
Launch the Map