The City performs annual maintenance on the sidewalk network, involving repair or replacement of sidewalk panels to address deficiencies of safety (trip hazards) or sidewalk failures such as cracking or spalling. The emphasis of this program delivery is to address the removal of safety concerns, with prioritization of the program based upon performed condition assessments of the sidewalk infrastructure.


This project also delivers on the completion of new transit bus pads to improve mobility accessibility and connectivity.

Construction Impacts in 2020

  • Portions of the sidewalks, bus pads and roadways will be temporarily closed while the areas are being replaced and/or installed. Please obey all signage for safety reasons.
  • Be aware of open excavation. Obey all signage and fenced off areas. 
  • Equipment will be on-site for excavation and materials installation.
  • Noise disturbance will occur during work hour.

Timeline 

  • July to September 2020 - Dates are subject to change and weather-dependent. 

Locations

Repairs to existing sidewalks

Sable CrescentSunnyside Crescent
Spruce CrescentBeaverbrook Crescent
Sylvan CrescentLangholm Drive at Dawson Road
Langholm Drive at Lennox DriveWheatstone Crescent

Bus Pad Installations

Sunnyside Crescent/Sunset BoulevardRiel Drive at the Enjoy Center
Giroux Road/North Ridge DriveGiroux Road/Lacombe Drive
Forest Drive/Fernwood CrescentSir Winston Churchill Avenue/Woodland Road
Harwood Drive/Heritage BoulevardFalstaff Avenue/Forest Drive
St. Albert Trail/Gate Avenue (2 stops) 

Interactive Map

Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year!