Gladstone Crescent Sanitary Sewer Rehabilitation
Project Description
The Sanitary sewer on Gladstone Crescent to Greenwich Crescent was built in 1962. It has been identified through CCTV that the sewer and manholes require rehabilitation through cured-in-place pipe (CIPP) lining.
CIPP lining will:
- be installed through existing manhole accesses
- restore the structural integrity of the sewer for another 50 years
- enhance the corrosion resistance
- improve the pipe’s hydraulic capacity
- reduce potential for odour nuisance
Installation is anticipated to take place at night when the flows in the sewer are lower.
Project Area
Potential Construction Impacts
During lining operations, residents can anticipate the following potential construction impacts:
- Local traffic disruptions
- Possible trail closure
- Noise from construction equipment
- Odour from sewer cleaning and lining operations
- Short-term service disruption (likely at night)
Timeline
Construction is anticipated to take place from August to October 2023.
Interactive Map
Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year!
Last edited: August 14, 2023