Hydrant Replacement Program

About the Project

The Fire Hydrant Replacement Program is an annual program that inspects, maintains, and replaces fire hydrants in the city.

Hydrants are in existing neighbourhoods and could be located in or adjacent to sidewalk panels, driveways, boulevards and/or trees.

The City of St Albert has a total of 1,792 fire hydrants.

In 2026, 30 hydrants and valve replacements are anticipated to be replaced.

Work to include: 

  • Replacement of existing fire hydrants, cathodic protection and hydrant valves
  • Site restoration (sod and concrete)
  • Landscape maintenance

Locations

Phase 1- COMPLETED

27 Lambert Cr86 lambert Cr
27 Morgan Cr3 Hampton Cr
17 Hampton Cr25 Marchand Pl
26 Malmo Cr7 Morgan Cr
30 Lambert Cr39 Lambert
2 Eden Cr31 Everest Cr
140 Mission Ave18 Bocock
28 Bocock22 Beaverbrook
25 Chisolm Ave220 Chatelain Dr
245 Carnegie Dr13 Elliot Pl
40 Beaverbrook 

PHASE 2- to Start in September

9 Harriot Ct5 Heath Pl
 R.B.C Hydrant on Bellerose49 Hamilton Cr
 41 Barrymore Dr5 Atkinson Pl
157 Larose12 Leblanc Pl

Potential Construction Impacts 

Construction is anticipated to impact the boulevard, driveway and sidewalk.

  • Limited on-street parking. 
  • Portions of the sidewalks, boulevard and roadways will be temporarily closed.
  • Open excavation. Please obey all signage and fenced-off areas.
  • Equipment will be on-site for excavation and materials installation.
  • Temporary Water Disruption
  • Noise disturbance will occur during work hours.

Timeline

  • May to October 2026