Hydrant Replacement Program

About the Project

The Fire Hydrant Replacement Program is an annual program that inspects, maintains, and replaces fire hydrants in the city.

Hydrants are in existing neighbourhoods and could be located in or adjacent to sidewalk panels, driveways, boulevards and/or trees.

The City of St Albert has a total of 1,792 fire hydrants.

In 2026, 30 hydrants and valve replacements are anticipated to be replaced.

Work to include: 

  • Replacement of existing fire hydrants, cathodic protection and hydrant valves
  • Site restoration (sod and concrete)
  • Landscape maintenance

Locations

Phase 1

27 Lambert Cr86 lambert Cr
27 Morgan Cr3 Hampton Cr
17 Hampton Cr25 Marchand Pl
26 Malmo Cr 

PHASE 2

39 Lambert Cr30 Lambert Cr
 140 Mission Ave41 Berrymore Dr
 7 Morgan Cr9 Harriot Ct
 28 Bocock Pl5 Heath Pl
40 Beaverbrook49 Hamilton Cr
25 Chisolm Ave22 Beaverbrook Cr
31 Everest Cr5 Atkinson Pl
220 Chatelain Dr12 Leblanc Pl
245 Carnegie DrR.B.C Hydrant on Bellerose
18 Bocock Pl 13 Elliot Pl
157 Larose 

Potential Construction Impacts 

Construction is anticipated to impact the boulevard, driveway and sidewalk.

  • Limited on-street parking. 
  • Portions of the sidewalks, boulevard and roadways will be temporarily closed.
  • Open excavation. Please obey all signage and fenced-off areas.
  • Equipment will be on-site for excavation and materials installation.
  • Temporary Water Disruption
  • Noise disturbance will occur during work hours.

Timeline

  • May to October 2026

Interactive Map

Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year!

Launch the Map

 