Hydrant Replacement Program
About the Project
The Fire Hydrant Replacement Program is an annual program that inspects, maintains, and replaces fire hydrants in the city.
Hydrants are in existing neighbourhoods and could be located in or adjacent to sidewalk panels, driveways, boulevards and/or trees.
The City of St Albert has a total of 1,792 fire hydrants.
In 2026, 30 hydrants and valve replacements are anticipated to be replaced.
Work to include:
- Replacement of existing fire hydrants, cathodic protection and hydrant valves
- Site restoration (sod and concrete)
- Landscape maintenance
Locations
| 18 Bocock Pl | 13 Elliot Pl |
| 28 Bocock Pl | 12 Leblanc Pl |
| 22 Beaverbrook Cr | 157 Larose |
| 40 Beaverbrook | 27 Lambert Cr |
| 41 Berrymore Dr | 39 Lambert Cr |
| 25 Marchand Pl | 30 Lambert Cr |
| 140 Mission Ave | 86 lambert Cr |
| 26 Malmo Cr | 9 Harriot Ct |
| 27 Morgan Cr | 5 Heath Pl |
| 7 Morgan Cr | 49 Hamilton Cr |
| 25 Chisolm Ave | 17 Hampton Cr |
| 220 Chatelain Dr | 3 Hampton Cr |
| 245 Carnegie Dr | R.B.C Hydrant on Bellerose |
| 31 Everest Cr | 5 Atkinson Pl |
| 2 Eden Pt |
Potential Construction Impacts
Construction is anticipated to impact the boulevard, driveway and sidewalk.
- Limited on-street parking.
- Portions of the sidewalks, boulevard and roadways will be temporarily closed.
- Open excavation. Please obey all signage and fenced-off areas.
- Equipment will be on-site for excavation and materials installation.
- Temporary Water Disruption
- Noise disturbance will occur during work hours.
Timeline
- May to October 2026