Sheridan Drive Stormwater Improvements

About the Project

The City is improving the stormwater infrastructure within the Sheridan Drive area. Construction will upgrade existing storm utilities to help reduce the amount of ponding that could occur and provide the City with future options to help reduce flooding and improve overland flows to other catchment areas.

Construction will include:

  • Upsizing storm pipes and connections to trunk mains.
  • Providing additional catch basins within collection locations. 
  • Adding green space improvements for the absorption of rainwater.

Project Timeline

  • August 2025 to October 2025.

Interactive Map

Check out the City’s interactive Construction Projects Map that outlines the construction projects planned for this year!

Launch the Map


Related Pages

Last edited: July 11, 2025