Information and Checklists

Info Sheets and Checklists

What requirements must be met before I can begin construction?

No site construction is permitted without an approved Development Permit and the Development Supervisor's acceptance of the following five (5) deliverables:

1. Civil Engineering Drawings (Site Development Drawings)
2. Certificate of Insurance (COI)
3. Letter of Credit (LOC)
4. On-Street Construction Permit (OSCP)
5. Site Servicing Permit (SSP)*

* Typically the approval of the SSP and payment of the applicable permit fees result in the clearance to commence site construction.

Where can I find references for Best Management Practices for Erosion and Sedimentation Control submissions?

The following links may provide you some information on Best Management Practice (BMP) for Erosion and Sediment Control submissions: 

Alberta Transportation - Field Guide For Erosion and Sediment Control

Last edited: February 16, 2021